Some products may take 2-4 weeks to ship.
Rubber wall base, stair treads, reducers and rolled rubber flooring.
Getting the old floor, adhesive, and fasteners out without damaging the substrate.
Layout, cutting, adhesives, seaming, and the install itself.
Transitions, wall base, stairs, and edge details.
Choosing a rubber or vinyl reducer by height difference and floor pair, with the ADA's 1/4 and 1/2 inch rules and CRI's carpet edge rule.
Measuring, scribing, nose filler, adhesive or tape, and rolling rubber stair treads, from Roppe and Johnsonite installation instructions.
How to pick a transition by the height difference between floors, what the ADA allows on accessible routes, and the mistakes that cause trip edges and failed...
Conditioning, scribing, adhesive choices, nose filler and rolling for vinyl and rubber stair treads and risers, based on Roppe's instructions.
Acclimating, gluing, forming corners and rolling vinyl and rubber wall base, with Roppe and Johnsonite specs side by side.
| Price |
|---|
| SKU |
| Rating |
| Discount |
| Vendor |
| Tags |
| Weight |
| Stock |
| Short Description |
Description here
Description here