National Equipment · Shot blasters

National A95 Shot Blaster

Manuals, parts diagrams, maintenance schedule and specs

Manuals & documents

PreFloor-hosted copies of the manufacturer's documents. Check the manufacturer for newer revisions.

Parts diagrams

Exploded views and part numbers from the operating manual (402306 Rev H), pages 36–50. Each link opens the manual at that page.

The A95 is National's 8" shot blaster, powered by a 1.5 HP electric motor on 115 V. National calls it the first in its Apex series: a compact machine for small to midsize jobs, paired with the DL2000 dust collector.

Specifications

Specs from National's A95 product page and the operating manual (402306 Rev H).

Spec Value
Blasting width 8" (20 cm)
Width 12" (30 cm)
Length / height Length 37"-45" (manual); 37"-43.4" (product page); height 34"-41" (86-104 cm)
Weight 121 lb (54 kg)
Blasting capacity Up to 400 sq ft/hr (manual); 430 sq ft/hr (product page)
Power 1.5 HP (1.12 kW), 115 V, 17 A; 20 A breaker required
Max operating amps by serial A95-10XXXX / -23XXXX: 17 A at 120V/60Hz; A95-11XXXX: 12 A at 230V/50Hz; A95-20XXXX: 16 A at 110V/50Hz
Dust collector DL2000, or another collector rated 200 CFM minimum
Shot S280 (about .028") for fine profiles and thin paint; S330 (about .033") for fine-medium texture and coatings around .04" thick

Maintenance schedule

From National's A95 operating manual (402306 Rev H). Hour figures are operating hours; wear rates depend on the job.

Interval What to do
Before, during and after operation Check for foreign matter in the hopper, feed spout and blast wheel; check shot level
Daily, before work Check hose connections and seals; dust hose and filter; empty the dust collector; inspect blast wheel, feed spout, liners and fasteners; separator; magnets and brushes; electrical connections and motor
1-12 hours after any repair Check safety devices work; check accessible fasteners are tight
10-20 hours Readjust brushes flush with the floor or replace them
30-40 hours Blast wheel and control cage: replace when blades are worn by 1/3 or deeply grooved
50 hours Liners: replace when side liners are worn to the threaded stud
100 hours Separator rebound plate: replace the separator if wear is significant
200 hours Replace a cracked or worn feed spout; grease the rear wheels
Annually Full overhaul and cleaning

Videos from National

National's A95 videos, covering setup, power, operation and amp readings.